administrator

About administrator

This author has not yet filled in any details.
So far administrator has created 6 blog entries.

St. Louis At Home Architect & Designer Awards names Liquid Assets Pools Winners of all pool categories in 2016

More than 300 people attended the 2016 Architect and Designer Awards ceremony on February 18 at Palladium Saint Louis. After a cocktail hour and three-course dinner, At Home Publisher Leslie Tunney and Editor-in-Chief Veronica Theodoro took the stage to announce the winners in 30 categories, including Liquid Assets Pools in all pool categories.

The ninth-annual Architect […]

By |March 22nd, 2016|News|Comments Off on St. Louis At Home Architect & Designer Awards names Liquid Assets Pools Winners of all pool categories in 2016

St. Louis At Home Architect & Designer Awards names Liquid Assets Pools Winners of all pool categories in 2014 & 2015

St. Louis At Home has announced the winners of the eighth annual St. Louis At Home Architect & Designer Awards. At a reception held at The Coronado Ballroom, St. Louis At Home publisher Leslie Tunney presented awards in 27 categories to more than 40 local companies who placed in the contest.
The first, second, and third place […]

By |November 27th, 2015|News|Comments Off on St. Louis At Home Architect & Designer Awards names Liquid Assets Pools Winners of all pool categories in 2014 & 2015

4. Steel Placement

Steel reinforcing rods are placed inside the excavation, along the bottom, up the sides, into the bond beam, and around the skimmers. Firmly wired together, these rods add to the strength and long life of your pool shell.

By |May 27th, 2015|Building Stages|Comments Off on 4. Steel Placement

3. Plumbing

Our plumbers will install state-of-the-art equipment to efficiently clean and purify your pool water. Based on your geographical location, this step may be performed before or after the shell is formed.

By |May 27th, 2015|Building Stages|Comments Off on 3. Plumbing

2. Excavation

Roll in the heavy-duty equipment, it’s time to dig a big hole. In most cases, it will take about one working day to complete the excavation of your pool and remove the soil from your yard. If you’re interested in keeping some of the soil for other parts of your yard, just let us know […]

By |May 27th, 2015|Building Stages|Comments Off on 2. Excavation

1. THE SITE

Prior to excavation, we will stake out your new pool or spa. The layout is based on your custom design, and upon your approval, we are ready to dig it.

By |May 27th, 2015|Building Stages|Comments Off on 1. THE SITE