Building Stages

4. Steel Placement

Steel reinforcing rods are placed inside the excavation, along the bottom, up the sides, into the bond beam, and around the skimmers. Firmly wired together, these rods add to the strength and long life of your pool shell.

By |May 27th, 2015|Building Stages|Comments Off on 4. Steel Placement

3. Plumbing

Our plumbers will install state-of-the-art equipment to efficiently clean and purify your pool water. Based on your geographical location, this step may be performed before or after the shell is formed.

By |May 27th, 2015|Building Stages|Comments Off on 3. Plumbing

2. Excavation

Roll in the heavy-duty equipment, it’s time to dig a big hole. In most cases, it will take about one working day to complete the excavation of your pool and remove the soil from your yard. If you’re interested in keeping some of the soil for other parts of your yard, just let us know […]

By |May 27th, 2015|Building Stages|Comments Off on 2. Excavation

1. THE SITE

Prior to excavation, we will stake out your new pool or spa. The layout is based on your custom design, and upon your approval, we are ready to dig it.

By |May 27th, 2015|Building Stages|Comments Off on 1. THE SITE